Skip to content

Process Docs

Rewritten 2026-09-24 (ledger A12, the second pass). This page was the May 2026 plan for seven process pages, describing each under names since retired; its prior body is kept whole at 02_Working/Archive/Wiki_pre_second_pass_2026_09/documents/process-docs.md. The seven pages exist and were rewritten or retired in place on 2026-09-24; this page is their index. Process pages capture how the system runs. Since 2026-09-16 the operational story comes from 02_Working/Strategy/Company_Overview/FLUXX_DESCRIPTION_2026_09.md and the 2026-09-08 to 09-24 documents in 02_Working/CLI_Briefs/, and the canon in 00_Canon/Q-G/ carries the same content; Kevin’s view of the industry sits behind a barrier at 04_Fluxx_Shared/Industry_View/.

The seven pages

Capture to Delivery Workflow

Current. The chain from the take to the finished shot: build the world once; shoot real actors in front of it; keep the record; see the shot on the floor in minutes; finish from the record, at full quality, in the cloud. Sources: THE_FRAME.md §1, the description §2.2 and §4, THE_ANSWER_3.md, 00_Canon/Q-G/Q-G31.

On-Set Operations

Current. The cart and the collector, the crew on the day as roles, the script log with two authors, the stage used right (the wall as a light, many small walls, sets in parallel), the director deciding on the floor, the stage manager’s day view. Two cameras, not three. Sources: the description §2.2 and §3.5 to §3.8, System/UI_AND_FEATURES.md, THE_ANSWER_4.md.

Cloud-Side Operations

Retired in place and rewritten. The floor postvis stays on the stage render node; the cloud is the studio’s farm for the 2K postvis and the deliverable per selected take; one hub on the stage, one in the studio; files are truth, databases are views; the agent verifies and flags, nothing blocks. The vault, the VM lifecycle and per-tenant cost attribution are out of the plan. Sources: THE_ANSWER_3.md, Collector_Spec/COLLECTOR_SPEC.md.

Two Finishing Tracks

Retired in place. There is no track field; three renders from one record, per selected take; selection stays with the show, the edit the authority once it exists. Sources: THE_ANSWER_3.md, System/UI_AND_FEATURES.md §3.8.

Viz Cascade

Retired in place and rewritten. The scene package, built the week before the shoot aligned with the prelight week, in three steps whose names are internal only; pairing on the day by the production’s identifier. Sources: 00_Canon/Q-G/Q-G56 and Q-G90 as rewritten 2026-09-23, THE_ANSWER_3.md.

Vendor Integration Path

Retired in place and rewritten. Visual effects as a department of the show; vendors as asset suppliers to the scene-package format or as lent crew; what a vendor receives is the record and the exports; GlassBox the engineering partner on Automate, a vendor. Sources: the description §3.7, 00_Canon/Q-G/Q-G34 and Q-G42, THE_ANSWER_3.md.

AI Provenance and Human Likeness Policy

Unchanged by the second pass. Generative tools build the worlds and never touch the performance; the one hard wall is performance and likeness (Q-G50); provenance is kept in the record. Sources: 00_Canon/Q-G/Q-G18, Q-G50, Q-G83.

Source layers

The May 2026 source canon under 02_Working/Strategy/Company_Overview/*_Source_*.md and the NotebookLM transcripts under _Inbox/NotebookLLM/ are records of the earlier model and are not quoted for the product. The May thesis paper’s transcripts folder under _Inbox/NotebookLLM/ carries the retired term in its folder name and is left as it is.

Whitepapers: see Whitepapers. The earlier overview tracks: see Company Overviews. The pitch project: Projects/Pitch_2026/START_HERE.md.

Audience visibility

industry, vendor, production, sales, director, investor.