Fluxx
Why this wiki exists
Layer 1 of the three-layer canon architecture sketched at S98 (Brain Reorg v0.3). The live canon surface for the Fluxx team, Kevin, Ari, Nick, to find the current state of Fluxx canon, the latest shipped artifacts, historical context, and the validation state of the canon substrate.
The wiki composes from existing source-of-truth files in Kevin_Brain. The source files are authoritative. This wiki is a generated read surface. Since 2026-09-16, product copy comes from 02_Working/Strategy/Company_Overview/FLUXX_DESCRIPTION_2026_09.md; since 2026-09-24 the canon in 00_Canon/Q-G/ holds the product and company facts that carry it, and Kevin’s view of the industry sits behind a barrier at 04_Fluxx_Shared/Industry_View/.
What changed recently
The second pass (2026-09-24, ledger A12):
- Every wiki page that carried a retired name is rewritten or retired in place. The twelve Process and Technology pages describe the current chain from the description; the pages whose subject is itself retired say so in one dated line at the top; every prior body is kept whole at
02_Working/Archive/Wiki_pre_second_pass_2026_09/. Nothing is deleted. - The retired names are off this wiki: the timing term (never a product or brand name, off every external surface since 2026-09-16, Mo-Sys is seeking a trademark on it), and the two product names retired as trademark risks the same day. The product is “the Fluxx platform”, a placeholder; six candidates in the description §6, none locked.
00_Canon/Doctrine/corrected in place with dated notes where it stated the retired names as rules; the Q-G frontmatter strings swept.- The canon is now product and company facts only: 44 entries in
00_Canon/Q-G/, the clean source data Nick builds from. Kevin’s view of the industry, 24 entries, moved behind a barrier to04_Fluxx_Shared/Industry_View/Q-G/(Kevin, 2026-09-24), kept whole, referenced beside the canon only for the industry white paper.
The canon strip (2026-09-23, ledger A12):
- 68 live Q-G entries, 28 retired to
02_Working/Archive/Canon_Q-G_retired_2026_09/, never deleted; 33 product entries rewritten from the description; 24 industry-view entries annotated;00_Canon/Q-G_INDEX.mdis generated byqg_index.pyand never hand-edited.
The description and the pitch project (2026-09-16 to 09-24, ledgers A12 and P8):
- The description of Fluxx, v3, is the source for every product line. Mission on top: keep the craft of filmmaking alive in the era of AI by making it affordable again. Director control is its own point. Two cameras, not three.
- The Third Path,
Projects/Pitch_2026/: one master document, the description as its overview, every deck a cut of it. The teaser is cut; the presented deck follows when Kevin names it. A clean break from the seven-deck family; every deck named by its job.
The stack and the plan (2026-09-08 to 09-24, ledgers A41 to A52):
- THE ANSWER 1 to 4: the stage stack decided and priced, the collector specified (R-1 to R-92), the bridge decided, the UI and features specified, the script supervisor’s record decided. Five development phases, each ending in a demonstration; the stage day as milestone one; the last test a full dress rehearsal at two cameras.
Earlier history (May to June 2026), kept for the record with the retired names removed:
- Org and deck restructure (S149, 2026-06-01): Ari Jampolsky retitled CPO and Co-Founder; Jeff Brown retitled Studio Relations; team-page salaries set to TBD; decks reframed as a shared Cold Open plus an audience appendix, since superseded by The Third Path.
- The partnership retirement sweep (S149, 2026-06-01): the JV and Sony partnership path retired (Q-G96, now in the retired archive); Fluxx proceeds standalone; GlassBox continues as the engineering partner on Automate, a vendor, not a JV; Demo 2 reframed as the White Dragon Technology Demo; the
sonyaudience tier retired. - AI-stance cascade (S145, 2026-05-30): the one hard wall is performance and likeness (Q-G50), not the pixel; provenance tracked for EU AI Act Article 50 disclosure.
- The product rename cascade (S142, 2026-05-30): the render pipeline’s product name of that date and the vault name, both since retired from every surface on 2026-09-16.
- Phase 0 ship (S120, 2026-05-19): the canon substrate stood up; Q-G88 (ComposiTrack is the canonical product name everywhere; ChromaTrack patent-only); the wiki live at
wiki.fluxxvp.com, gated to the team via Cloudflare Access (S126).
How to use this wiki
- Company, what Fluxx is, who’s on the team, the current terms.
- Process and Technology, the chain from the take to the finished shot as decided in September 2026; the retired pages say so at the top.
- Pitch Decks, current and historical shipped pitch material.
- Demos, the White Dragon June 2026 page and the demo archive.
- Validation, gap-analysis surface and audit views over the canon decomposition substrate.
Status
Switchover delivered at S125 (2026-05-20): 00_Canon/Q-G/ is the sole canonical Q-G location (44 product and company entries since 2026-09-24; 24 industry-view entries at 04_Fluxx_Shared/Industry_View/Q-G/; 28 retired) and OPEN_QUESTIONS.md is retired. Access is single-tier “Fluxx team access”, Kevin, Ari, Nick (@fluxxvp.com), MFA required, opened at S126 (2026-05-20). Validation pages remain as the canon-health surface. Deferred: Google IdP cutover; full canon-rendering build (Goal A Phase 5).